Installation Instructions

T-Vap Pro

20240910

Important!

  • Details such as overlap joints, fastenings, pipe and cable pass-throughs, or for example beams, should be sealed airtight with approved aids for the inner climate shield system, such as tape (T-Flex), grommets, sealant, or double-sided tape. See system description!
  • Mechanical fastening (staples/nails) of the vapor barrier must always be galvanized. Fastening with staples should be taped (with T-Flex) for optimal airtightness.
  • Consider the attachment of the climate screen. The vapor barrier should be fixed with a minimum center distance of 600 mm on a solid frame structure. Additional fastening is required for folds or extensions.
  • Connections/seals of the vapor barrier between different types of construction materials, where the vapor barrier is fixed, such as between wood and concrete or steel/sheet metal, should be made with an extra length of the vapor barrier in folds/waves just before the connection (approximately 50 mm).
  • Creases in the foil that meet the taped joint across should be sealed extra with at least 200 mm of taping over the taped overlap and along the crease (100 mm in each direction). This extra taping should follow the bottom and top of the crease!
  • An internal climate screen should always be mounted offset into the outer wall (maximum 1/3 of the total insulation thickness). The shown installation should/can be equipped with an insulated zone inside the vapor barrier (serves as an installation zone for electricity, etc.).
  • The variable vapor barrier (T-Vap Pro) should not be used in constructions where spaces with permanently high humidity are allowed (e.g., swimming pools). However, this does not apply to kitchens or equivalent bathrooms in residences.
  • During installation and in colder seasons, consider the risk of condensation on the inside of the external wind barrier. With the insulation in place, this risk increases significantly, which is why a quick installation of the internal climate screen (vapor barrier) counteracts the risk of condensation.
  • The use of the Vapor Barrier in roof constructions is possible if the requirement for fall-through safety has been considered. This applies to roof constructions such as sloped roofs. However, not in roofs against cold attics, which may require additional moisture investigation and fall-through protection. The product should not be used on concrete surfaces as the alkali resistance has not been evaluated.
  • The vapor barrier is stored and kept packaged/protected from sunlight (UV radiation) or constantly higher temperatures (>+35°C).
  • The vapor barrier is freely exposed (not built-in) with UV protection that corresponds to the construction time (< 3 months).

Wall

Installation of load-bearing interior walls should occur after the vapor barrier has been installed on the exterior wall, or alternatively, a strip of the vapor barrier should be installed between the load-bearing interior wall and the exterior wall. Taping of all joints is done with Sealing Tape T-Flex for complete tightness and durability. Fastening and joining to concrete is done with Joint Tape T-Duo Concrete.

1. Rulla ut ångbromsen och kapa till önskad längd. Räkna alltid med minst 200 mm överlappning.
2. Fäst upp ångbromsen mot väggens överkant/hammarband. Överlappningen sker från taket ner på väggens ångbroms. Skarv skall vara klämd mellan regel och annan regel eller skivmaterial.
3. Fäst ångbromsen ordentligt mot väggen (med galvaniserad klammer eller läkt med minst c-avstånd 600 mm eller dubbelhäftande skarvtejp T-Duo). Ångbromsen skall avslutas så att den täcker insidan av väggens syll samt viks ut på golvet ovan golvets ångspärr med minst 200 mm för överlappning av golvets folie. Alternativt avslutas ångbromsen utan överlapp med tejp mot syllen (T-Flex) eller med T-Duo Concrete ner mot eventuell betongplatta.

4. Stående skarv skall utföras klämd över stående regel med överlappning minst 200 mm. Överlappet tejpas (T-Flex).
5. Var extra noga med infästningspunkterna runt fönster- och dörröppningar. I stomöppningar görs enklast en krysskärning (Alternativ skärning kan göras och tejpningen skall då vara motsvarande lufttät) av ångbromsen, från hörn till hörn. Ångbromsen viks sedan ut i stommens smyg och fästs med klammer eller tejp. Innan infästningen sker skall extra bitar av ångbroms (fyrkantig) med vikning placeras under flikarna i var hörn så att de täcks helt med ångbromsen! Kanter och skarvar tejpas (T-Flex). Biten av ångbromsen kan ersättas med tejp eller ark av tejp (T-Flex).

T Vap Montering

Bjälklag

1. Skär till eller använd en lämplig storlek av ångbromsen (längd och bredd) med avseende på bjälkarnas centrumavstånd. Rullningen skall ske uppifrån och ner. Anpassa måttet på ångbromsen så att den slutar vid bälklagets underkant. Underifrån skall den underliggande våningens ångbroms dras upp och överlappa lika.
2. Fäst med klammer och börja vid en stående regel/stödben. Låt en flik om minst 100 mm sticka ut på var sida om yttersta reglarna (stödbenen).
3. Ångbromsen viks ut på bjälkarna i bjälklaget och Y-skärs for att vikas ner i mellan. Fixera och klamra varje flik runt bjälkarna.
4. Täta/tejpa runt varje bjälke noga med Tätningstejp T-Flex. Samtliga överlapp och skarvar utförs med tejpning (T-Flex).