Installation Instructions

Strip YEP 2500

2024-04-05

Important!

  • Rolls should be stored upright on a flat, dry surface and protected from sun and precipitation.
  • YEP 2500 is diffusion-tight and when mounted on a wooden substrate, the space underneath should be ventilated according to standard practice.

1. Sill insulation on foundation wall

The strip should cover at least the width of the sill board. Cross joints should be made with at least 150 mm overlap and longitudinal joints with at least 80 mm. The strip is clamped between the sill and the foundation.

YEP2500 Remsa Miljöbild1

2. Under the flashing

The strip should cover at least the width (of the base plate) plus 150 mm. The cross joint should be made with at least 150 mm overlap. The strip is clamped between the base plate and the nailable substrate

YEP2500 Remsa Miljöbild 2

3. Moisture protection for decking joists

The strip should cover the top edge of the beam and at least 10 mm on each side. The protruding edges are folded down to create a drip edge. The strip is clamped between the decking and the beam or alternatively between the beam and the bearer.

YEP2500 Remsa Miljöbild 3

4. Joint and reinforcement strip on roof